Built on this coast since 2009
Seaward Development builds a small number of homes at a time, with the same engineers and contractors on every project. Three buildings so far, 198 homes, all handed over on time or early.
See the buildings
Seventeen years, four buildings
- 2009
Seaward is founded
Two engineers and an architect set up in a rented office above the old souk.
- 2019
Al Noor Residences
96 homes in the old town, handed over on schedule.
- 2022
Harbour House
64 homes on the marina, handed over two months early.
- 2024
Palm Terraces
38 garden homes in a low-rise terrace, handed over on schedule.
- 2026
Tideline breaks ground
Piling began in March. The structure is due to reach level 10 in early 2027.
- 2028
Tideline handover
Keys to 41 homes in the last quarter of the year.
Delivered buildings
“The site manager knew our names by the second visit. When the kitchen was a week late, he called us before we noticed.”
“We have bought from four developers in this city. Seaward is the only one where the handover snag list fitted on one page.”
The people you will meet
Every buyer meets the design and construction leads at least once before handover, usually at the show apartment or on a walk round the site.
- KHKarim HaddadManaging director
- LFLeila FaroukHead of design
- DMDaniel MorettiConstruction director
Register before launch pricing
Registered buyers see the full price list and floor availability one week before public release.
Thank you. You are on the list, and the sales team will email the price list and floor availability one week before public release.
Something went wrong. Check your details and try again, or call the sales gallery on +971 4 000 0000.


