Seaward Development builds a small number of homes at a time, with the same engineers and contractors on every project. Three buildings so far, 198 homes, all handed over on time or early.

See the buildings
White scale model of the Tideline tower in the design studio

Seventeen years, four buildings

  1. 2009

    Seaward is founded

    Two engineers and an architect set up in a rented office above the old souk.

  2. 2019

    Al Noor Residences

    96 homes in the old town, handed over on schedule.

  3. 2022

    Harbour House

    64 homes on the marina, handed over two months early.

  4. 2024

    Palm Terraces

    38 garden homes in a low-rise terrace, handed over on schedule.

  5. 2026

    Tideline breaks ground

    Piling began in March. The structure is due to reach level 10 in early 2027.

  6. 2028

    Tideline handover

    Keys to 41 homes in the last quarter of the year.

“The site manager knew our names by the second visit. When the kitchen was a week late, he called us before we noticed.”
SASami A.Owner at Palm Terraces since 2024
“We have bought from four developers in this city. Seaward is the only one where the handover snag list fitted on one page.”
JTJames T.Owner at Al Noor Residences since 2019

The people you will meet

Every buyer meets the design and construction leads at least once before handover, usually at the show apartment or on a walk round the site.

  • KHKarim HaddadManaging director
  • LFLeila FaroukHead of design
  • DMDaniel MorettiConstruction director

Register before launch pricing

Registered buyers see the full price list and floor availability one week before public release.

Thank you. You are on the list, and the sales team will email the price list and floor availability one week before public release.

Something went wrong. Check your details and try again, or call the sales gallery on +971 4 000 0000.